Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
- 6. Fuel system
   + 6.1.2. Technical characteristics
   + 6.2. Multidot system of injection of fuel
   + 6.3. System of injection MPI/MPFI (6-cylinder engines)
   - 6.4. The power supply system of diesel engines
      6.4.2. Technical characteristics
      6.4.3. The air filter
      6.4.4. A rope of an accelerator and elements of a pedal of an accelerator
      6.4.5. The gauge of level of fuel
      6.4.6. A fuel tank
      + 6.4.7. The injecting pump
      6.4.8. Speed of idling and the maximum speed of work of engine AAS
      6.4.9. A mode of fast idling (engine AAS)
      6.4.10. Residual volume of fuel (engine AAS)
      6.4.11. Fuel injectors
      6.4.12. A control system of work of the diesel engine
      6.4.13. An inlet collector
   6.5. The device of service of heating
   6.6. Diagnostics of malfunctions of system of heating
   6.7. The conditioner: not only "pluses", but also "minuses"
   6.8. Rules of service of the conditioner
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

6.4.12. A control system of work of the diesel engine

THE GAUGE OF POSITION OF THE PEDAL OF THE ACCELERATOR

Removal

PERFORMANCE ORDER
1. Remove the furnish panel.
2. Disconnect a rope, a returnable spring and remove a pedal from an arm.
3. Turn off fixing bolts and remove the gauge.

Installation

Installation is spent upside-down removals.

THE GAUGE OF TEMPERATURE OF THE COOLING LIQUID

PERFORMANCE ORDER
1. Merge a part of a cooling liquid from the engine.
2. Disconnect a socket of connection and unscrew the gauge.

Installation

Installation is spent upside-down removals.

THE GAUGE OF SPEED OF ROTATION OF THE CRANKED SHAFT

Removal

PERFORMANCE ORDER
1. Disconnect a connection socket.
2. Turn off fixing screws and remove the gauge from the block of cylinders (engine AAT).

Installation

Installation is spent upside-down removals.

ЗАПОРНЫЙ THE VALVE

Removal

PERFORMANCE ORDER
1. Turn off a fixing nut and disconnect a wire.
2. Unscrew the valve and remove a sealing ring.

Installation

Installation is spent upside-down removals.

THE VALVE OF SYSTEM OF START OF THE ENGINE

Removal

PERFORMANCE ORDER
1. Turn off the fixing screw and remove the valve from the injecting pump.
2. Remove sealing rings and the filter. Disconnect a connection socket.

Installation

Installation is spent upside-down removals.

THE VALVE OF ADJUSTMENT OF PRESSURE (ENGINES 1Z AND AHU)

Removal

PERFORMANCE ORDER
1. Disconnect the air branch pipes, disturbing to removal.
2. Disconnect a connection socket.
3. Disconnect vacuum hoses, having marked them before removal.
4. Turn off fixing nuts and remove the valve.

Installation

Installation is spent upside-down removals.

THE GAUGE OF TEMPERATURE OF ARRIVING AIR (ENGINE AVR)

Removal

PERFORMANCE ORDER
1. Disconnect a connection socket.
2. Remove a fixing clip and remove the gauge.

Installation

Installation is spent upside-down removals.

THE GAUGE OF THE STREAM OF AIR (EXCEPT ENGINES AAS)

Removal

PERFORMANCE ORDER
1. Disconnect a plastic casing from an inlet branch pipe and an intermediate branch pipe.
2. Disconnect an air hose from the gauge of a stream of air.
3. Disconnect an air hose from the gauge.
4. Release fixing clips of a cover.
5. Disconnect a socket of connection and uncover also the gauge of a stream of air.
6. Disconnect a socket of connection and uncover also the gauge (engine AAT).
7. Remove a gauge guard.
8. Turn off fixing bolts of the gauge of a stream of air.

Installation

Installation is spent upside-down removals.

THE ELECTRONIC BLOCK OF MANAGEMENT

Removal

PERFORMANCE ORDER
1. Remove the panel of furnish and a casing of the electronic block of management.
2. Turn off fixing bolts for access reception to the electronic block of management and remove it, disconnect connection sockets.

Installation

Installation is spent upside-down removals.

THE SYSTEM RELAY

Removal

PERFORMANCE ORDER
1. Remove the furnish panel.
2. Turn off the fixing screw, remove a casing and get the relay.

Installation

Installation is spent upside-down removals.

SWITCHES ON THE COUPLING AND BRAKE PEDAL

Look subsection 9.1.5 and subsection 10.15.

THE GAUGE OF TEMPERATURE OF FUEL

Removal

PERFORMANCE ORDER
1. Uncover the injecting pump.
2. Turn off fixing screws and remove the gauge.

Installation

Installation is spent upside-down removals.


On the main page