BMW 3 series E30

Since 1983-1994 of release

Repair and car operation



BMW E30
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. The engine
   - 3.1.2. Specifications
      3.1.3. Kinds of the repair work which is carried out without dismantle of the engine
      3.1.4. An order of installation of the piston of 1st cylinder in ВМТ a compression step
      3.1.5. A cover of a head of cylinders
      3.1.6. A soaking up collector
      3.1.7. A final collector
      3.1.8. Covers of a chain of a drive of a cam-shaft (engine M10)
      3.1.9. A chain and asterisks (engine M10)
      3.1.10. Covers of a gear belt (engines M20 and М40)
      3.1.11. A gear belt and cam-shaft asterisks (engines M20 and М40)
      3.1.12. Forward epiploons
      3.1.13. A head of cylinders
      3.1.14. The pallet
      3.1.15. The oil pump
      3.1.16. A flywheel (a leading disk)
      3.1.17. A back epiploon коленвала
      3.1.18. Engine mount details
   + 3.2. Dismantle and engine major repairs
   + 3.3. An engine electric equipment
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Transmissions
+ 9. Coupling
+ 10. Brake system
+ 11. A running gear
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

3.1.17. A back epiploon коленвала

Replacement

PERFORMANCE ORDER
1. Remove a flywheel (a leading disk).
2. Turn away bolts of the holder of an epiploon, including 2 bottom bolts with which to the holder the pallet fastens.
3. Cautiously remove the holder with an epiploon, having made an incision consolidation and having tracked safety of a lining of the pallet.
4. Carefully clear a demountable surface under the holder of an epiploon.
5. Beat out an epiploon from the interior of the holder, having put it on wooden бруски.
6. Grease and запрессуйте a new epiploon with blows through the prorate.
7. Assemblage is carried out upside-down. At assemblage clear the holder and demountable planes of the engine and put hermetic RTV on joints with the block of cylinders and on an acting part of a lining of the pallet.

The prevention

Bolts of the holder tighten in regular intervals in a cross order, at first tighten fastening bolts to the block of cylinders, then – 2 bottom bolts.



On the main page