 BMW E30
 + 1. The maintenance instruction
 + 2. Maintenance service
 - 3. The engine
 - 3.1.2. Specifications
 3.1.3. Kinds of the repair work which is carried out without dismantle of the engine
 3.1.4. An order of installation of the piston of 1st cylinder in ВМТ a compression step
 3.1.5. A cover of a head of cylinders
 3.1.6. A soaking up collector
 3.1.7. A final collector
 3.1.8. Covers of a chain of a drive of a cam-shaft (engine M10)
 3.1.9. A chain and asterisks (engine M10)
 3.1.10. Covers of a gear belt (engines M20 and М40)
 3.1.11. A gear belt and cam-shaft asterisks (engines M20 and М40)
 3.1.12. Forward epiploons
 3.1.13. A head of cylinders
 3.1.14. The pallet
 3.1.15. The oil pump
 3.1.16. A flywheel (a leading disk)
 3.1.17. A back epiploon коленвала
 3.1.18. Engine mount details
 + 3.2. Dismantle and engine major repairs
 + 3.3. An engine electric equipment
 + 4. Cooling system
 + 5. Heating and ventilation
 + 6. Fuel system
 + 7. An exhaust system
 + 8. Transmissions
 + 9. Coupling
 + 10. Brake system
 + 11. A running gear
 + 12. A body
 + 13. An electric equipment
 + 14. A good advice
 
 | 
 The prevention
  The top cover of a chain can be removed separately. For removal of both covers the special tool is required.  Removal
 
 
 
 
 | PERFORMANCE ORDER |  
 | 
 
 | 1. Disconnect the battery from weight. |  
 | 2. For removal of the bottom cover remove the fan with a casing (subsection 4.6 see), a radiator (subsection 4.5 see) and a pulley of a belt of the fan (subsection 4.6 see). |  
 | 3. Remove the pump of a cooling liquid (subsection 4.7 see). |  
 | 4. On a part of cars uncover the ignition distributor, бегунок and a plastic casing of black colour under бегунком. |  
 | 5. Uncover heads of cylinders (subsection 3.1.5 see). |  
 | 6. If the bottom cover turn away a pulley bolt коленвала acts in film, having fixed its adaptation BMW 11 2 100 or equivalent, or having stopped a flywheel through an observation port the big screw-driver. Remove a pulley a stripper, stripper captures should rest against a wall of an internal flute of a pulley. |  
 |  | 7. Turn on заглушку and get a spring натяжителя chains and плунжер, meaning considerable effort of straightening of a spring. |  
 | 8. Turn away bolts and nuts and remove the top cover. Sketch an arrangement of each bolt of fastening that at assemblage to turn them on former places. If necessary displace a cover hammer blows through the wooden prorate. |  
 |  | 9. Turn away bolts and nuts of fastening of the bottom cover. Keep in mind that from below the cover fastens 3 bolts to the oil pallet of the engine, it is necessary to release all bolts of the pallet. Turn away 3 specified bolts of fastening of a cover of a chain to the oil pallet. |  
 | 10. The sharp knife inserted under a lining between a cover and the pallet, cautiously not to damage a lining, separate the bottom cover. |  
 | 11. Easy blows of a hammer through the prorate destroy consolidation between a cover and the block of cylinders, uncover. |  
 | 12. Cautiously clear condensed planes of a cover and the block of cylinders of the rests of consolidations, having taken measures against damage of planes. |  |   Installation
 
 
 | PERFORMANCE ORDER |  
 | 
 
 | 1. Replace a forward epiploon (subsection 3.1.12 see). |  
 | 2. Put hermetic drops on demountable planes of the pallet and the bottom cover of a chain, and also to the place of a joint of a lining and the block of cylinders. The prevention
  If the pallet lining in a place прилегания chain covers is damaged, it is possible to cut off a part of the old lining supporting the block of cylinders and to replace with its piece from a new lining which in accuracy corresponds to the replaced. Paste a lining piece to the pallet special glue and put drops of hermetic RTV.   
 |  
 | 3. Establish a new lining of the bottom cover, having greased with its hermetic and gradually tighten bolts of fastening with the set moment in a cross order. At first tighten bolts of fastening of a cover to the block of cylinders, then bolts of fastening of the pallet. At excessive выступании linings cut it on a contour. After drawing of hermetic assemblage should be finished not later than through 10 mines, otherwise hermetic will harden. |  
 | 4. Establish the top cover of a chain, having cut off an edge acting parts of a lining. |  