Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1.1.2. Technical characteristics
   - 3.1.2. 5-cylinder engines
      3.1.2.2. Technical characteristics
      3.1.2.3. Sinhronizatsionnye labels timing
      3.1.2.4. Compression check
      3.1.2.5. A gazoraspredelitelnyj belt
      3.1.2.6. Натяжитель газораспределительного a belt, an asterisk
      3.1.2.7. Additional приводной a belt
      3.1.2.8. A camshaft cover
      3.1.2.9. A camshaft epiploon
      3.1.2.10. Epiploons of a cranked shaft
      3.1.2.11. A head of cylinders
      3.1.2.12. Hydraulic pushers
      3.1.2.13. A flywheel
      3.1.2.14. Engine fastenings
      3.1.2.15. The oil pallet
      3.1.2.16. The oil pump and маслозаборный a branch pipe
   + 3.1.3. 6-cylinder engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

3.1.2.11. A head of cylinders
THE GENERAL DATA

Sequence of a tightening of bolts of a head of cylinders

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Remove the top cover of the engine. Lift and fix a forward part of the car.
3. Remove additional приводной a belt.
4. Disconnect an exhaust pipe from a collector.
5. Remove a final collector.
6. Merge cooling liquid.
7. Disconnect a rope of an accelerator and the mechanism control cruise.
8. Remove an inlet collector.
9. Unscrew spark plugs.
10. Remove the ignition distributor.
11. Remove газораспределительный a belt.
12. Remove an asterisk of a camshaft and натяжитель, disconnect a back cover of a belt from a head.
13. Uncover a camshaft. Remove the vacuum pump of brakes and the piston in the left part of a head.
14. Disconnect necessary fuel hoses.
15. Disconnect all wires, heads of cylinders stirring to removal.
16. Unscrew head bolts in sequence, return sequence of a tightening (fig. Sequence of a tightening of bolts of a head of cylinders see).
17. Remove a head.

Installation

PERFORMANCE ORDER
Installation is spent upside-down removals. In drawing – the directing probes necessary for correct installation of a head.