Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
- 9. Transmission
   + 9.1.2. Technical characteristics
   - 9.2. A Mehnichesky transmission
      + 9.2.2. Technical characteristics
      9.2.3. The gear change mechanism
      9.2.4. Removal and installation manual transmission
      9.2.5. Partition manual transmission
      9.2.6. The multipurpose switch and the switch of lanterns of a backing
      9.2.7. The speedometer gauge
      9.2.8. Epiploons
      9.2.9. Evident repair of a transmission 012
   + 9.3. An automatic transmission
+ 10. Brake system
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

9.2.9. Evident repair of a transmission 012
THE GENERAL DATA

Transmission 012 in gathering
1. A conic roller bearing
2. A gear wheel of transfer of a backing
3. A gear wheel of 5th transfer
4. A gear wheel of 4th transfer
5. A gear wheel of 3 transfers
6. A gear wheel 2nd transfers
7. A gear wheel of 1st transfer
8. A conic roller bearing
9. Differential
10. Carter of coupling
11. The ball-bearing
12. Carter of a transmission
13. A leading shaft
14. The block of gear wheels of an intermediate shaft

Technical characteristics, 5-speed transmission 012

Code
AKL/AUF
ALP/AАD
 
4-cylinder
5-cylinder
Transfer number:
  – The main transfer
37:9 = 4.111
37:10 = 3.700
  – The first transfer
39:11 = 3.545
39:11 = 3.545
  – The second transfer
40:19 = 2.105
40:19 = 2.105
  – The third transfer
39:30 = 1.300
39:30 = 1.300
  – The fourth transfer
33:35 = 0.943
35:34 = 1.029
  – The fifth transfer
30:38 = 0.789
31:37 = 0.838
  – Backing transfer
35:10 = 3.500
35:10 = 3.500
Speedometer
The electronic
Greasing volume
2,35 litres
The specification
Transmissionnoe oil G 50 (synthetic)
SAE 75 W 90
Coupling drive
The hydraulic
Diameter of a disk муфты couplings
210 mm
228 mm
Diameter of a flange of a leading shaft
100 mm
108 mm
Speed on the highest transfer at 1000 rpm
34 km/h
36 km/h

The prevention

Do not grease the lever mechanism of the lever of a gear change.


THE LEVER MECHANISM OF THE LEVER OF THE GEAR CHANGE, ADJUSTMENT / CHECK

Transmission


Removal

PERFORMANCE ORDER
1. Disconnect a wire of the negative plug of the accumulator.
2. Turn off three top bolts of fastening of the engine and a transmission.
3. Disconnect a wire of grounding of a transmission from a check point.
4. Remove a socket of connection of a sending device of a speedometer and a socket of a multipurpose sending device having squeezed clips.
5. Disconnect a connection socket каталитического the converter.
6. Remove a protective plate картера transmissions.
7. Turn off bolts of fastening of a final collector.
8. Remove a forward exhaust pipe.
9. Remove a back cross-section beam.
10. Disconnect ropes of an automatic tension of seat belts from a transmission.
11. Remove draught of a gear change.
12. Remove a protective plate картера couplings.
13. Remove a protective plate of a leading shaft.
14. Disconnect semiaxes from a transmission.
15. Turn a steering wheel against the stop to the right and fix semiaxes having adhered them to a body.
16. Remove the working cylinder of coupling.
17. Remove an arm of the mechanism of a steering.
18. Establish the engine on a support.
19. Establish a transmission on a support
20. Remove fastening on a back left part of a transmission.
21. Remove forward fastening of the engine.
22. Remove the bottom bolts of fastening of a transmission and the engine.
23. Slowly lower a transmission.

Installation

Installation is made in sequence, return to removal.

At installation pay attention to the following:

     – Check up, that centering plugs have been established correctly.
     – Establish the working cylinder of coupling into place by means of the lever so that the bolt was inserted easily.
The prevention

The bolt for fastening of the working cylinder of coupling has the pointed end for simplification of installation.


The moments of an inhaling of carving connections

Transmission fastening to the engine:
  – Bolts М8
25 Н.м.
  – Bolts М10
45 Н.м.
  – Bolts М12
65 Н.м.
Fastening of a leading shaft to a flange:
  – М8
45 Н.м.
  – М10
80 Н.м.

TRANSMISSION FASTENING TO THE ENGINE

The 4-cylinder engine


1 = bolt М12 x 70
2 = bolt М12 x 85
3 = bolt М12 x 100
4 = bolt М8 x 15

The 5-cylinder engine

1 = bolt М12 x 70
2 = bolt М12 x 80
3 = bolt М12 x 90
4 = bolt М12 x 100
5 = bolt М11 x 120
6 = bolt М10 x 50
7 = bolt М10 x 40
8 = bolt М8 x 40

Arrangement of centering plugs: points And and In
 


Arrangement of centering plugs: points And and In


The prevention

If it is necessary for you to replace картер the main transfer or a conic roller bearing of a leading gear wheel or a hollow shaft and a deviation r it is not designated on a conic cogwheel, position of installation of a leading gear wheel should be defined before removal картера transmissions (it is necessary to spend measurements of the valid size of a deviation).

Before installation картера transmissions, check up, that directing plugs have been established in картере transmissions.

Address with a speedometer sending device very accurately. Do not drop it, differently speedometer indications can be not exact.


The mechanism of the main transfer

1. A speedometer drive
2. Дифферкнциал
3. A sealing ring
4. A cover of the main transfer
5. A bolt with a head under a face key – 25 Н m.
6. A lock ring
7. A flange of a leading shaft
8. A bolt with a head under a face key – 35 Н m.
9. The directing plug with a sealing ring
10. A concave washer
11. A lock ring
12. The ball-bearing of a leading shaft
13. A lock ring
14. A speedometer sending device
15. Carter of the main transfer
16. A bolt with a head under a face key – 10 Н m.
17. A connection socket многофугкционального a sending device
18. A cover of the channel of the lever of a gear change
19. A multipurpose sending device
20. A locking film for a multipurpose sending device
21. A bolt 25 Н m.
22. The lock of 5th transfer and backing transfer
23. A lock ring

The prevention

спидометра1 it is possible to replace a drive, without removing a transmission.

The differential 2 can be removed, without removing картер a transmission.

Remove a sealing ring 3 by means of tool VW 681.

Герметизируйте a cover of the main transfer 4 by means of hermetic AMV 188 200 03.

Always replace lock rings 6 and 23.

Establish a flange of a leading shaft by means of tool VW 295.

The party of a concave washer 10 with smaller diameter is turned to directing plug (the concave party).

Lock rings 11, 13 mark after removal.

Sealing ring of a flange of a leading shaft – remove by means of tool VW 681 and establish (on 5 mm below a surface картера the main transfer) by means of tool VW 195.

Carter of the main transfer 15: a sealing ring of a flange of a leading shaft – remove by means of tool VW 681. Establish (on 5 mm below a surface картера the main transfer) by means of tool VW 195. The plug of a rod of switching 3-ej/4th transfer – establish by means of tools VW 295 and VW 295А. Герметизируйте by means of hermetic AMV 188 200 03.

Cover of the channel of the lever of a gear change 18 – tighten a bolt of fastening to 20 Н.м.

22 it is possible to replace the lock of 5th transfer and transfer of a backing, without removing a transmission. The oblique party of the plastic plug is turned to a switching shaft. The moment of an inhaling of bolts of fastening: 10 Н m.


The mechanism of a leading shaft

1. Internal draught of switching
2. A rod of switching of 1st, 2nd, 5th transfers and transfer of a backing with a switching plug
3. A leading gear wheel with hollow shaft
4. Carter of a transmission
5. A bolt with a head under a face key - 25 Н m.
6. A bolt with a head under a face key for an axis of transfer of a backing – 35 Н m.
7. A bolt with a head under a face key – 25 Н m.
8. The lock
9. A bolt with a head under a face key – 40 Н m.
10. A washer
11. A switching shaft

12. A washer
13. A bolt with a head under a face key
14. A switching rod 3-ej/4th transfers and a switching plug
15. A leading shaft
16. A lock ring
17. A washer
18. A gear wheel передачт a backing
19. The needle bearing of a conducted gear wheel of transfer заденго a course
20. A persistent washer

The prevention

Remove a sealing ring of internal draught of switching 1 by means of tool VW 681 and establish заподлицо by means of tool VW 460/2. On the established transmission accurately remove a sealing ring by means of a screw-driver and establish by means of tool VW 423. In the beginning remove pipes of an exhaust system and draught of a gear change for empty seat reception.

Rod of switching of 1st, 2nd, 5th transfers and transfer of a backing with a plug of switching 2 – for assemblage dismantling/, remove / establish spring pins. 1-oj/2nd transfers it is possible to replace switching plugs separately. Replace a plug of switching of 5th transfer / of transfer of a backing only together with a ring of switching and a switching rod.

The bolt with a head under a face key for an axis of transfer of a backing 6 – 35 Н the Axis of transfer of a backing does not need to be removed m. for removal of a gear wheel of transfer of a backing.

Bolt with a head under a face key 7–25 Н m. of Vnutrennja the head party is turned to the safety mechanism of a spring / of the lock.

The lock 8 establish after installation of a shaft of switching 11 and an internal rod of switching.

Switching rod 3-ej/4th transfers and a switching plug: it is possible to replace a rod of switching or a switching plug separately. Replace the bearing of a rod of switching if it is worn out.


Removal of bolts of a shaft of switching

Arrows specify bolts of a shaft of switching.

Position of the mechanism of a gear change

1. A rod of switching of 5th transfer / of transfer of a backing with a switching plug
2. A switching rod 3-ej/4th transfers
3. A switching plug 1-oj/2nd transfers
4. A switching shaft
5. The lock
6. An internal rod of switching

Position of the leading shaft, leading gear wheel with hollow shaft, rods of switching and вилкок switchings

 

These elements should be established together.

The shaft of switching and internal rod of switching can be established later.

Installation of a shaft of switching and internal rod of switching

And – a switching shaft
In – an internal rod of switching

PERFORMANCE ORDER
1. Include 3rd transfer.
2. Establish a switching shaft.
3. Put an internal rod of switching In sideways on an aperture in картере the main transfer and combine it with an arm nest on a switching shaft.
4. Turn a switching rod inside in an arrow direction (fig. Installation of a shaft of switching and an internal rod of switching see).

Removal of the plug of a rod of switching

Take advantage of a hammer and an internal stripper And on 18,5–23,5 mm (for example, 1088 or Kukko 21/3).

Removal and installation of the bearing of a plug of switching

 

Removal and installation маслосборника

By arrow it is specified маслосборник

PERFORMANCE ORDER
1. Remove маслосборник by means of a screw-driver.
2. Insert маслосборник so deeply in картер transmissions that lock uvulas маслосборника were hooked for grooves in картере transmissions.
3. The cup маслосборника should look upwards in картере transmissions.

Installation of a sealing ring of an internal rod of switching

And = 1 mm

MECHANICAL TRANSMISSION – CARTER, GEAR WHEELS, SHAFT

Leading shaft

Leading shaft in assemblage

 
1. Carter of a transmission
2. The plastic plug
3. The needle bearing – a leading shaft
4. A lock ring
5. A gear wheel of 5th transfer
6. The needle bearing – 4th transfer
7. A gear wheel of 4th transfer
8. A synchronizer ring
9. Sliding муфта – 3-ja/4th transfers
10. A lock ring
11. A synchronizer nave – 3-ja/4th transfers
12. A lock ring
13. A lock ring
14. The ball-bearing – a leading shaft
15. A lock ring
16. Carter of the main transfer
17. The needle bearing – ведуший a shaft
18. A leading shaft
19. The needle bearing – 3rd transfer
20. A gear wheel of 3 transfers
21. A synchronizer ring – 3rd transfer.


The prevention

Always replace the plastic plug 2. It is absent on the leader to a shaft on which there are lubricant apertures for 3-ej/no 4th transfers.

The needle bearing 2 is damaged at removal. Always replace it. Establish it by means of tool VW 416В on depth in 214 mm, measuring from пеоверхности картера.

Lock ring 4 – specify a demanded thickness at replacement of a gear wheel of 5th transfer.

Lock ring 10 – specify a demanded thickness at replacement of a nave of the synchronizer.

Nave of the synchronizer 11 – acting ободок it is turned to a conducted gear wheel of 3 transfers.

Lock ring 13 – if you are going to use the old ball-bearing and a shaft, it is necessary to measure a thickness of an old lock ring and to replace its new the same thickness.

Lock ring 15 – if you are going to use the old ball-bearing and a shaft, it is necessary to measure a thickness of an old lock ring and to replace its new the same thickness

The needle bearing – a leading shaft. Establish by means of the tool 40-202.


The needle bearing of a leading shaft

Removal of the needle bearing of a leading shaft


 

Depth of installation of the needle bearing

And = 39,5 mm

Depth of installation is measured from a bottom edge of a verifying ruler to a bearing upper edge.

The ball-bearing

Ball-bearing installation in картер

 

PERFORMANCE ORDER
1. Establish a lock ring on a leading shaft.
2. Establish the ball-bearing on a leading shaft against the stop.
3. Establish a persistent heel выжимного the tool 3235 on the ball-bearing.
4. Establish выжимной the tool 3235 for шлицами a coupling disk on an entrance shaft.
5. Press on the ball-bearing having twirled two bolts In, established in deepenings of a persistent heel And.
6. Press the bearing against the stop by turns and gradually twisting two bolts.