|
1) write down value "and" before removal of the lock screw |
2) remove the lock screw and disconnect operating плунжер |
3) clear operating плунжер gasoline before installation |
4) check up a sealing ring of the lock screw about damages, if necessary replace (smaller diameter of a sealing ring is directed to the managing director плунжеру) |
5) wrap the lock screw back to value "and" |
6) check up and adjust a starting position and a backlash of a plate of the gauge |