Audi 80/90/Coupe

Since 1986-1991 of release

Repair and car operation



Audi 80/90/Coupe
+ 1.2. Car identification
+ 2. Engines, carburettors
3. Greasing system
+ 4. Cooling system
+ 5. Fuel system
+ 6. An exhaust system
+ 7. Ignition system
- 8. Transmission
   8.1.2. A plug - the main cylinder of coupling
   8.1.3. Press a coupling disk
   8.1.4. Malfunctions of coupling
   + 8.2. A mechanical transmission 012
   + 8.3. A mechanical transmission 01А
   + 8.4. An automatic transmission 089
   + 8.5. An automatic transmission 087
   8.6. Dismantling and assemblage of automatic transmissions
   8.7. The block of valves
   - 8.8. An automatic transmission 097
      8.8.2. The lever and a rope of the lever of a gear change
      8.8.3. The lock of an automatic gear change
      8.8.4. Removal and transmission installation
      8.8.5. The block of valves
      8.8.6. Differential and gear wheels
+ 9. Suspension brackets, wheels
+ 10. Brake system
+ 11. A steering
+ 12. A body, salon
+ 13. A central air
+ 14. An electric equipment

8.8.2. The lever and a rope of the lever of a gear change
THE GENERAL DATA

The lever перключения transfers / a gear change Rope


1. A cover
2. The program switch (Е122)
3. A casing of the lever of a gear change
усанавливайте a designation of the parking
Transfers forward
Establish after adjustment
The electromagnetic switch
4. The handle of the lever of a gear change
5. 9 Н.м.
6. A washer
7. The solenoid of the lock of a gear change
(№ 110)
8. 10 Н.м.
9. A torsionnaja spring
10. The gear change lever
With a plug for lever short circuit in position Р and N
11. The plug торсионой springs
12. A directing pin
Establish after installation компрессионной springs
13. A kompressionnaja spring
Establish on the gear change lever
Before installation of a directing pin
14. A lock ring
15. A washer
16. The basis
Put a layer of hermetic AKD 512 001 05 between the basis and a body
Establish bolts and fastening washers (the moment
Inhalings 10 Н.м.)
17. The plug
18. A washer
19. The switching lever
20. Муфта
21. A nut
The moment of an inhaling 20 Н.м.
22. A washer
23. The plug
24. Муфта
25. A washer
26. A cartridge
27. A cover
Replace if it is necessary
Check up accuracy of installation, that a moisture not
Has got on a rope of the lever of a gear change
28. 23 Н.м.
29. A clip

30. Transmission fastening
With fastening of a rope of a gear change
31. 40 Н.м.
32. A gear change rope
With the directing plug
Grease the rope ends before installation
Do not bend and do not overwind a rope
For adjustment:
преключите the gear change lever in position Р
ослабьте a nut on a rope clip
предвиньте the lever on a transmission in position Р (against the stop back)
After that, when the rope is in a loose condition, tighten a nut (21) to 20 Н.м.
After rope adjustment check up work of the switch of the lever преключения transfers and adjust it if it is necessary
33. An arm of a rope of the lever of a gear change
34. The clip screw
35. A clip
36. 5 Н.м.
37. The switch of the lever of a gear change
Check:
The engine should be started only when the gear change lever is in position Р or N
Backing headlights should join at inclusion of transfer of a backing
If is not present, turn the switch in a nest and again провверьте its work
38. The plug

Installation of an arm of the lever of a gear change in relation to the gear change lever

PERFORMANCE ORDER
1) translate the gear change lever in position R

And – probe for measurement of backlashes by thickness of 1.0 mm
2) establish probe between the lever of a gear change and the electromagnetic switch
3) press the electromagnetic switch to probeу and tighten a fastening nut
4) establish on the centre the bottom aperture of a plug of the lever of a gear change and submit pressure on the switch
5) the solenoid pin will close a plug
6) establish a casing of the lever of a gear change so that the gear change lever was opposite to mark N in a casing
7) the gear change lever should pass identical distance between positions N and D and positions N and R
8) establish the lever And by means of a pin or a drill

In (diameter 4.0 mm), inserted into a casing aperture

The switch of the lever of a gear change, installation

PERFORMANCE ORDER
1) switch the gear change lever in position in position N
2) establish the switch so that fastening (it is specified by an arrow) was fixed on the gear change lever
3) tighten bolts of fastening to 5 Н.м.
4) remove a pin or a drill

After switch installation, check up its work.


On the main page