Audi 80/90/Coupe
+ 1.2. Car identification
+ 2. Engines, carburettors
3. Greasing system
+ 4. Cooling system
+ 5. Fuel system
+ 6. An exhaust system
+ 7. Ignition system
- 8. Transmission
8.1.2. A plug - the main cylinder of coupling
8.1.3. Press a coupling disk
8.1.4. Malfunctions of coupling
+ 8.2. A mechanical transmission 012
+ 8.3. A mechanical transmission 01А
- 8.4. An automatic transmission 089
8.4.2. The lever and a rope of the lever of a gear change
8.4.3. The lock of an automatic gear change
8.4.4. The mechanism of management throttle заслонкой
8.4.5. Removal and transmission installation
8.4.6. Check of the moments of a gear change
8.4.7. The main transfer
8.4.8. Differential
+ 8.5. An automatic transmission 087
8.6. Dismantling and assemblage of automatic transmissions
8.7. The block of valves
+ 8.8. An automatic transmission 097
+ 9. Suspension brackets, wheels
+ 10. Brake system
+ 11. A steering
+ 12. A body, salon
+ 13. A central air
+ 14. An electric equipment
|
The lever of switching of transfers / a gear change Rope
1. The plug
2. A spring
3. An arm of the lever of a gear change
Put a layer of hermetic AKD 512001 between an arm and a transmission casing at installation
4. A casing of the lever of a gear change
5. The locking solenoid of an automatic gear change
6. An arm of a rope of switching
7. A sealing ring
8. A lock ring
9. A gear change rope
10. An angular arm of a rope of switching
|
11. A cover
12. The switch of bulbs of neutral, parking transfers and backing transfer
13. 8 Н.м.
14. A rope clip
15. The switching lever
16. Муфта
17. The plug
18. A lock ring
19. A spring
20. A centering pin
21. The gear change lever
22. The plug |
The prevention Before the beginning of work with working engine, always move the gear change lever to position Р (parkings) and put the car on a manual brake.
Disconnect a wire of the negative plug of the accumulator before the beginning of work with any of elements of system of an electric equipment.
It is necessary to press a brake pedal before the gear change lever can be removed from parking transfer.
Do not bend and do not overwind a rope. Grease the rope ends before installation.
Installation / adjustment
PERFORMANCE ORDER |
1) tighten rope fastening on an arm of a rope to 15 Н.м. |
2) establish a rope in a clip for a rope before installation of an angular arm |
3) move the gear change lever to position Р |
4) ослабьте a nut of a clip of a rope |
5) move switching lever to position Р (back against the stop) |
6) tighten a nut of a clip of a rope to 8 Н.м. |
|
The mechanism of the lever of a gear change and gear change rope
1. The handle of the lever of a gear change
2. A casing of the lever of a gear change
Establish designation Р forward
Establish after adjustment of the electromagnetic switch
3. The electromagnetic switch
4. A cover
5. 5 Н.м.
6. A torsionnaja spring
7. The plug
8. A washer
9. The lever switch
Gear changes
Check: the engine should be started, when the lever
Switchings is
In position Р or N
Backing headlights should light up at inclusion of transfer of a backing.
If is not present, turn the switch in a nest and again check up its work
10. The basis
At installation put a layer of hermetic of A/CD 512 001 between the basis and a body
11. A clip bolt
12. An arm
13. A lock ring |
14. A rope of the lever of a gear change
With directing and the plug
Grease the rope ends before installation, tighten a nut of fastening of a rope on an arm to 15 Н.м.
Check up, that the going tube densely sat
For adjustment move the gear change lever in position P
Move switching lever on a transmission in position Р (against the stop back)
Tighten a nut of a clip of a rope to 20 Н.м.
15. A cover
16. Муфта
17. A washer
18. The plug
19. Муфта
20. A cartridge
21. A spring clamp
22. 20 Н.м.
23. The switching lever
24. A washer
25. The plug
26. A compression spring
Establish on the lever of switching before installation of a directing pin
27. The plug
28. A directing pin
29. The lever of a gear change with a plug for lever lock-out in position Р or N |
The prevention Disconnect a wire of the negative plug of the accumulator before the beginning of work with any of elements of an electric equipment of the car.
Installation of an arm of the lever of a gear change in relation to the gear change lever
PERFORMANCE ORDER |
|
1) establish probe And, thickness of 0.8 mm, between the lever of a gear change and the electromagnetic switch |
2) press the electromagnetic switch to probeу and tighten a fastening nut |
3) after installation of the electromagnetic switch, establish on the centre the bottom aperture of a plug of the lever of a gear change and submit pressure on the switch |
4) the solenoid pin will close a plug |
| 5) establish a casing of the lever of a gear change so that the gear change lever was opposite to mark N in a casing (neutral transfer) |
|
6) establish the lever And by means of a pin or a drill
In = a pin, diameter 4.0 mm, inserted into a casing aperture
|
7) switch the gear change lever in position in position N |
|
8) establish the switch so that fastening (it is specified by an arrow) was fixed on the gear change lever |
9) tighten bolts of fastening to 5 Н.м. |
10) remove a pin or a drill
|
|
After switch installation, check up its work. |
On the main page
|