| 1. Establish the suitable container under a transmission. |
| 2. Take the internal end of a power shaft from a transmission (subsection 10.3.2 see). Do not unscrew a nut of fastening of a power shaft to a nave. |
| 3. Using a soft wire, adhere the internal end of a power shaft to a body. |
| 4. Using a screw-driver edge as the lever, take a sealing ring from a transmission. |
| 5. Clear a nest of a sealing ring. |
| 6. Apply a thin film greasings on an external surface of a sealing ring. |
| 7. Using tubular оправку the corresponding diameter, establish a sealing ring in a transmission. |
| 8. Establish a power shaft. |
| 9. Check up oil level in a transmission and, if necessary, finish it to norm. |