Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
- 10. Brake system
   + 10.1.2. Shock-absorbers
   + 10.2. Technical characteristics
   10.3. Prorolling of hydraulic system
   10.4. Hydraulic tubes and hoses
   10.5. Brake overlays of forward brakes
   10.6. Brake overlays of back wheels
   10.7. Brake Pads back brakes
   10.8. A brake disk of a forward wheel
   10.9. A brake disk of a back wheel
   10.10. A brake drum of a back brake
   10.11. A support of a forward brake
   10.12. A support of a back brake
   10.13. The wheel cylinder of a back brake
   10.14. The main brake cylinder
   10.15. A brake pedal
   10.16. The vaakuumnyj amplifier
   10.17. The vacuum valve of a servoamplifier
   10.18. A rope of a manual brake
   10.19. The lever of a manual brake
   10.20. The valve of adjustment of pressure in a contour of back brakes (till 96 of century)
   10.21. The switch of fires of a stoplight
   10.22. The general description of system of antiblocking of brakes (ABS)
   10.23. System ABS elements
   10.24. The vacuum pump (diesel and petrol engines in volume 2,3)
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

10.24. The vacuum pump (diesel and petrol engines in volume 2,3)

4-CYLINDER ENGINES

Removal

PERFORMANCE ORDER
1. The vacuum pump is established on a left-hand side in a back part of the block of cylinders.
2. Disconnect a vacuum hose from the pump.
3. Will twist a fixing bolt and remove a fixing clip of the pump.
4. Remove the pump from the block of cylinders and remove a sealing ring.

Installation

PERFORMANCE ORDER
Installation is spent upside-down removals. Check up, that at installation the groove on a conducted gear wheel of the pump (marksman) has been correctly combined with a leading gear wheel.

5-CYLINDER ENGINES

Removal

PERFORMANCE ORDER
1. The vacuum pump is established on a left-hand side of a head of the block of cylinders.
2. Disconnect a vacuum hose from the pump.
3. Turn off fixing nuts.
4. Remove the pump and a pusher.
5. Remove a sealing ring.

Installation

Installation is spent upside-down removals.

Check and repair

PERFORMANCE ORDER
1. By means of a vacuum manometre check up, that the depression created by the pump, made a minimum of a mercury column of 500 mm.
2. If the pump is faulty, it is necessary to replace it.


On the main page