Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
- 10. Brake system
   + 10.1.2. Shock-absorbers
   + 10.2. Technical characteristics
   10.3. Prorolling of hydraulic system
   10.4. Hydraulic tubes and hoses
   10.5. Brake overlays of forward brakes
   10.6. Brake overlays of back wheels
   10.7. Brake Pads back brakes
   10.8. A brake disk of a forward wheel
   10.9. A brake disk of a back wheel
   10.10. A brake drum of a back brake
   10.11. A support of a forward brake
   10.12. A support of a back brake
   10.13. The wheel cylinder of a back brake
   10.14. The main brake cylinder
   10.15. A brake pedal
   10.16. The vaakuumnyj amplifier
   10.17. The vacuum valve of a servoamplifier
   10.18. A rope of a manual brake
   10.19. The lever of a manual brake
   10.20. The valve of adjustment of pressure in a contour of back brakes (till 96 of century)
   10.21. The switch of fires of a stoplight
   10.22. The general description of system of antiblocking of brakes (ABS)
   10.23. System ABS elements
   10.24. The vacuum pump (diesel and petrol engines in volume 2,3)
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice

10.4. Hydraulic tubes and hoses
THE GENERAL DATA

The prevention

On models with ABS disconnect the accumulator before the work beginning to prevent air hit in module ABS.


Replacement

PERFORMANCE ORDER
1. For reduction of losses of a brake liquid remove a cap of a tank of a brake liquid and tightly close a mouth a polyethylene film or press corresponding brake hoses.
2. At removal of a flexible hose turn off a nut of connection and remove a hose from fastenings.
3. For removal of a brake tube, turn off nuts of connections on the ends of a tube and get a tube from fastenings.
4. At installation do not tighten a nut of connections too strongly.
5. At connection of hoses to supports use new copper washers and tighten bolts of connections банджо till the demanded moment of an inhaling.
6. Check up, that hoses and tubes have been laid correctly and have not been overwound or pressed.


On the main page