Removal and installation
The prevention Works are carried out together.
PERFORMANCE ORDER |
1. Open a cowl and close rags wings and an air inlet lattice. |
|
2. Disconnect hoses стеклоомывателя. |
|
3. Outline contours of loops of a cowl. |
|
4. Enclose rags under cowl corners, ask the assistant to keep a cowl on the one hand, turn away bolts of loops and remove a cowl. |
5. Installation is carried out upside-down. |
|
Adjustment
After installation it is necessary to adjust latch position so that the cowl was densely closed, and the cowl surface was заподлицо with wings.
PERFORMANCE ORDER |
1. Outline bolts of a latch of a clamp of a cowl. |
2. Release bolts and move a clamp to the necessary position then bolts tighten. |
|
3. Turning out or turning, adjust cowl buffers on a radiator rack so that the closed cowl was заподлицо with wings. |
4. And a cowl loop it is necessary to grease a latch periodically литолом. |
|
|