Audi 100

1982-1990 of release

Repair and car operation




Audi 100
+ 1.1. Controls and devices
+ 2. Technical characteristics
- 3. Engines
   - 3.1. Four-cylinder engines
      3.1.1. Removal and engine installation
      - 3.1.2. Dismantling and engine assemblage
         3.1.2.1. Removal and installation of a head of the block of cylinders
         3.1.2.2. Removal of a camshaft and pushers of valves
         3.1.2.3. Camshaft survey
         3.1.2.4. Definition of a technical condition of hydropushers of valves
         3.1.2.5. Installation of a camshaft and pushers of valves
         3.1.2.6. Removal and installation of valves (dismantling of a head of the block)
         3.1.2.7. Survey, дефектовка and repair of details of a head of the block of cylinders
         3.1.2.8. Backlashes between cams of a cam-shaft and pushers of valves
         3.1.2.9. A camshaft drive
         3.1.2.10. Removal and installation of an intermediate shaft
         3.1.2.11. Removal and flywheel installation
         3.1.2.12. Replacement of epiploons of a cranked shaft
         3.1.2.13. Removal and installation oil картера
         3.1.2.14. Removal, check and installation of the oil pump
         3.1.2.15. Dismantling of shatunno-piston group
         3.1.2.16. Survey and check of details of shatunno-piston group
         3.1.2.17. Assemblage of shatunno-piston group
         3.1.2.18. Removal, survey and installation of a cranked shaft
   + 3.2. Five-cylinder engines
   + 3.3. The diesel engine
+ 4. Cooling system
+ 5. An exhaust system
+ 6. The power supply system
+ 7. Transmission
+ 8. A running gear
+ 9. A steering
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment

3.1.2.7. Survey, дефектовка and repair of details of a head of the block of cylinders
THE GENERAL DATA

The sizes of valves of the four-cylinder engine

 
The inlet valve
The final valve
a
40,0 mm
33,0 mm
b
7,97 mm
7,95 mm
With
91 mm
90,8 mm

The sizes of a saddle of the valve

The sizes of a saddle of the valve:

The inlet valve

The final valve

PERFORMANCE ORDER
1. After dismantling of a head of the block to wash out all details in gasoline, to wipe and dry. To clear chambers of combustion and valves of a deposit.
2. To examine a block head. If there are cracks on walls of the chamber of combustion, traces прогара, etc., to replace a block head.
3. To check up by means of a metal ruler and probeов, whether planeness of a surface of the head adjoining to the block is broken. For this purpose a ruler to put an edge on a surface of a head of the block in the middle, lengthways and then across and probeом t