Audi 100

1982-1990 of release

Repair and car operation




Audi 100
+ 1.1. Controls and devices
+ 2. Technical characteristics
+ 3. Engines
+ 4. Cooling system
+ 5. An exhaust system
- 6. The power supply system
   - 6.1. The power supply system of carburettor engines
      6.1.1. Replacement of a filtering element of the air filter
      6.1.2. Removal and installation of the air filter
      6.1.3. Temperature regulator check
      6.1.4. Check of the valve of a temperature regulator
      6.1.5. Removal and installation of the fuel pump
      6.1.6. Check of pressure of forcing of the fuel pump
      6.1.7. Removal and installation of a cable of a drive of an accelerator
      6.1.8. Adjustment of a cable of a drive of an accelerator
      6.1.9. Replacement of the gauge of level of fuel
      6.1.10. Removal and installation of a fuel tank
      6.1.11. Replacement of the filter of thin clearing of fuel
      6.1.12. Removal and carburettor installation
      + 6.1.13. Dismantling and carburettor assemblage
      - 6.1.14. Carburettor Pierburg adjustments 1B3
         6.1.14.1. Adjustment of frequency of rotation of start-up of the engine
         6.1.14.2. Adjustment of starting backlashes air заслонки
         6.1.14.3. Adjustment приоткрывания throttle заслонки
         6.1.14.4. Adjustment of the accelerating pump
         6.1.14.5. Idling adjustment
      + 6.1.15. Carburettor Pierburg adjustments 2Е2
      + 6.1.16. Carburettor Keihin adjustments
   + 6.2. The power supply system of engines with fuel injection
   + 6.3. The power supply system of the diesel engine
+ 7. Transmission
+ 8. A running gear
+ 9. A steering
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment


https://www.youtube.com/channel/UCoah5uA-uF-j35-MalVTfRQ


6.1.14.4. Adjustment of the accelerating pump
PERFORMANCE ORDER
1. To remove the carburettor.
2. To fill поплавковую the chamber with fuel and to put under the carburettor a measured beaker with a funnel.
3. To take away the lever (2) from the screw (1).
4. To turn throttle заслонку from an emphasis against the stop ten times, spending for each course approximately 3 with, putting it in action the accelerating pump.
5. To measure quantity of fuel in a beaker, the received value to divide into ten. The result is pump giving for one cycle. For one cycle the accelerating pump should submit (0,90,15) fuel sm3.
6. If the received result differs from specified, to adjust productivity of the accelerating pump, turning a cam (1), preliminary having weakened the screw (2).
7. After adjustment to tighten the screw.

On the main page