Removal and installation of components of a central air of air
|
Attentively familiarise with the maintenance air Central air - the general information and safety measures has undressed. Charge a discharge of a refrigerator path to experts of the service-centre of company Citroyon. Do not start At all performance of any procedures with components of a refrigerator path, preliminary without having discharged system! |
Unique procedure which can be executed without a system discharge is replacement procedure drive a compressor belt. The description of the given procedure is resulted in the Head Routine maintenance. At replacement of temperature gauge BITRON follow instructions Check of serviceability of functioning, removal and installation of electric switches and gauges of system of cooling has undressed. It is necessary to charge performance of all other repair and service procedures to experts.
In case of need the compressor can be отболчен and will shift aside without a detachment of refrigerator lines (do not forget to remove preliminary приводной a belt).
|