Citroen Xantia
+ Introduction
+ The operation manual
+ Routine maintenance
+ Engine repair
- Systems of cooling, heating
Detachment and replacement of hoses of system of cooling
Removal, check of a condition and radiator installation
Removal, check of serviceability of functioning and thermostat installation
Check of serviceability of functioning, removal and fan installation (ов) cooling systems
Check of serviceability of functioning, removal and installation of electric switches and gauges of system of cooling
Removal and installation of the water pump
Removal and installation of a casing of the thermostat / the fuel filter (diesel models)
System of heating/ventilation of salon - the general information
Removal and installation of components of system of heating/ventilation of salon
Air central air - the general information and safety measures
Removal and installation of components of a central air of air
+ The power supply system and release
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and salon furnish
+ Onboard electric equipment
+ Electric equipment schemes
|
Removal and installation of components of system of heating/ventilation of salon
Assemblage of management by heater functioning
|
Procedures of dismantle and installation of assemblage of management by functioning of a heater are among demanding from the executor of enough high qualification, and their performance will charge more correctly to experts of a car repair shop. |
Removal
|
1. Remove assemblage of the panel of devices (address to the Head the Body and salon furnish).
2. Having released clamps, uncover the top part of the control panel.
3. Release срезные clamps of fastening of cables of management and disconnect tips of cables from levers of the block of management. |
4. Disconnect electroconducting from the block of management and lamps of illumination of the panel.
|
|
|
Installation
Installation is made upside-down. Before защелкиванием to the place of the panel of devices make sure of serviceability of functioning of levers of the control panel. Installation of the panel of devices make according to the instructions resulted in the Head the Body and furnish of salon.
Cables of management of heater functioning
Removal
|
1. Turn out two bottom fixing screws, then accurately having hooked a small screw-driver, release clamps and remove facing of the control panel by radio receiver/heater functioning.
2. On the models equipped with a ware shelf in the central part of the panel of devices, turn out four fixing screws and remove a ware shelf.
3. On the models equipped with an autoradio tape recorder, turn out two fixing screws, take a radio tape recorder from the panel of devices and disconnect from its back part electroconducting and an antenna cable.
4. Turn out four screws and remove a radio tape recorder casing. At a corresponding complete set disconnect from a casing electroconducting and an antenna cable.
5. For the purpose of providing of access to top приводным to cables of assemblage of management, release clamps and uncover management assemblages.
6. Access to the bottom cables opens after отпускания screw fixture and extraction of the control panel from the panel of devices.
7. For removal of cables release срезные clamps and disconnect tips of cables of control levers.
8. To disconnect a tip of a cable from the heater block, get under the panel of devices (in case of need remove the bottom sections of the panel) and disconnect cables, operating as it is described above.
9. Try to remember routes of a lining of removed cables. |
|
Installation
Installation is made upside-down. Pay attention to following moments:
a) Track correctness of a lining of cables of management;
b) Track reliability of fixing of cables срезными clamps;
c) Before to establish the components removed for the purpose of providing of access, make sure of serviceability of functioning of assemblage of management of a heater.
The heater heat exchanger
|
Procedures of dismantle and installation of the heat exchanger are among demanding from the executor of enough high qualification, and their performance will charge more correctly to experts of a car repair shop. New sealing rings шлангового a socket will be necessary. |
Removal
|
1. Remove assemblage of the panel of devices (address to the Head the Body and salon furnish). |
2. Turn out four screws of fastening of a directing casing of electroconducting to a casing of a heater and an arm of a steering column. |
|
3. Give two top nuts of fastening right assembly скобы panels of devices to an arm of a steering column. |
|
4. Turn out the bottom bolt of fastening right assembly скобы panels of devices to a floor, then liberate from assembly скобы electroconducting. |
|
5. Remove скобу. |
|
6. Disconnect electroconducting from the electromotor of the fan of a heater, its resistor and the control panel a heater. Liberate a plait from intermediate clamps on heater assemblage. |
|
7. Release clamps and uncover the top part of the control panel heater functioning. Disconnect electroconducting from illumination lamps.
8. Empty cooling system (address to the Head Routine maintenance).
9. In an impellent compartment, necessarily, uncover a camshaft (engine Repair see the Head) for the purpose of providing of access to шланговому to a socket of the heat exchanger of a heater on a back partition.
10. Where it is required, release a metal clip in the top part of a socket.
11. Release a clamp, having wrung out it to the left (the Detachment and replacement of hoses of system of cooling see). |
12. Turn out two screws of fastening of a facing lath шлангового a socket to a partition of an impellent compartment. |
|
13. Remove a facing lath together with a sealant. |
|
14. In an impellent compartment give a bolt and two nuts of fastening of assemblage of a heater to a partition (do not forget about washers). |
|
15. In salon remove assemblage of a heater and disconnect from it an air line. Prepare for gathering of a spilt cooling liquid.
|
Not to soil a carpet covering, cover a floor of salon with a polyethylene film. |
|
|
16. Having dismantled heater assemblage, remove a lath of fastening of branch pipes with пенопластовым a sealant, then release four clamps and take from assemblage of a heater the heat exchanger. |
|
|
Installation
Installation is made upside-down. Pay attention to following moments:
a) do not forget to establish into place a plate of fastening of branch pipes with пенопластовым a sealant;
b) do not forget to pass a heater tube through the plug through passage in a partition of an impellent compartment;
c) Installation of the panel of devices make according to the instructions resulted in the Head the Body and furnish of salon;
d) In summary do not forget to make refuelling of system of cooling (address to the Head Routine maintenance).
The electromotor of the fan of a heater
Removal
|
1. Release fixing clamps/turn out screws and remove the carpet panel of furnish under the panel of devices from the passenger party of the car. |
2. Give three fixing screws, then lower assemblage of the electromotor and disconnect from it electroconducting. |
|
3. Now the motor can be separated from крыльчатки by a reversing of two fixing screws. |
|
Installation
Installation is made upside-down.
The resistor of the electromotor of a drive of the fan of a heater
Removal
|
1. Release fixing clamps/turn out screws and remove the carpet panel of furnish under the panel of devices from the passenger party of the car.
2. The resistor is established in the basis of a casing of a heater, near to приводным the fan electromotor. |
3. Turn the basis of resistive assemblage, separate it from a casing of a heater and disconnect electroconducting.
|
|
|
Installation
Installation is made upside-down. |
On the main page
|