Citroen Xantia
+ Introduction
+ The operation manual
+ Routine maintenance
+ Engine repair
+ Systems of cooling, heating
- The power supply system and release
- The power supply system - petrol models
Removal and installation of assemblage of an air cleaner
Removal, installation and adjustment of a cable of gas
Removal and installation of a pedal of gas
Neetilirovannoe fuel - the general information and use rules
Systems of injection of fuel - the general information
Sbrasyvanie pressure in the power supply system
Removal and installation of the fuel pump
Removal and installation of the gauge of the expense of fuel
Removal and installation of a fuel tank
Check of a condition and adjustment of system of injection of fuel
Removal and installation of the case of a throttle
Removal and installation of components of system Bosch Motronic 5.1
Removal and installation of components of system Magneti-Marelli 8Р
Removal and installation of the inlet pipeline
Removal and installation of a final collector
+ The power supply system - diesel models
+ Systems of decrease in toxicity and release of the fulfilled gases
+ Engine electric equipment
+ Coupling
+ Transmission
+ Power shafts
+ Uniform hydraulic system
+ Brake system
+ Running gear and steering
+ Body and salon furnish
+ Onboard electric equipment
+ Electric equipment schemes
|
Removal and installation of the inlet pipeline
Removal
Disconnect a negative wire from the battery.
Models 1.6 and 1.8 l
|
1. Remove the air sleeve connecting an air cleaner with the case of a throttle (Removal and installation of assemblage of an air cleaner see).
2. Disconnect the core of a cable of gas from a cam throttle заслонки, take a cover of a cable from a basic arm (do not forget to remove a flat washer and a fixing clamp). At a corresponding complete set disconnect also приводной a cable of inclusion of a mode kick-down (Automatic transmission see).
3. Turn out two bolts of fastening of directing electroconducting to the top part of the pipeline. Take away directing aside, together with the wires laid in it and hoses, having cleared away space for pipeline removal.
4. Release clamps and disunite contact sockets of electroconducting of injectors of injection.
5. Without forgetting about the preventions made in section of Sbrasyvanie of pressure in the power supply system, ослабьте fixing collars also disconnect hoses of giving and return of fuel from a fuel highway. At assemblage it is necessary to replace factory collars of braided type more practical screw or worm.
6. Release a fixing collar () and disconnect a hose of the vacuum amplifier of brakes, and also other ventilating and vacuum hoses from the top part of the inlet pipeline. Necessarily mark hoses for the purpose of mess prevention at their connection.
7. Give fixing nuts, remove the pipeline from the engine and take it from a motor compartment of the car. Remove two sealing linings of the pipeline (at lining assemblage are subject to replacement without fail). |
|
L models 2.0
|
1. Execute the procedures described above in subsection "Models 1.6 and 1.8 l", subitem 2-3.
2. Release clamps and disunite contact sockets of electroconducting of injectors of injection.
3. Without forgetting about the preventions made in section of Sbrasyvanie of pressure in the power supply system, ослабьте fixing collars also disconnect hoses of giving and return of fuel from a fuel highway. At assemblage it is necessary to replace factory collars of braided type more practical screw or worm.
4. Release a fixing collar () and disconnect a hose of the vacuum amplifier of brakes, and also other ventilating and vacuum hoses from the top part of the inlet pipeline. Necessarily mark hoses for the purpose of mess prevention at their connection.
5. Liberate all hoses from clamps on the top plane of a fuel highway.
6. Turn out a bolt of fastening of a directing tube measuring probeа to a pipeline wall.
7. Give six nuts/bolts of fastening of the pipeline to a head of cylinders. Remove assemblage of the pipeline and take it from an impellent compartment. Remove a sealing lining (at assemblage they are subject to replacement without fail). |
|
Installation
Installation is made upside-down. It is necessary to give special attention to following moments:
a) Track, that interfaced surfaces of the pipeline and a head of cylinders were absolutely pure and dry. In the correct image lay new linings. After pipeline installation in stages in regular intervals tighten fixture with demanded effort;
b) Track correctness of connection of all hoses and reliability of fastening by their collars;
c) In summary do not forget to make adjustment of a cable of gas (Removal, installation and adjustment of a cable of gas see) and, - at a corresponding complete set, - a cable of inclusion of a mode kick-down (Automatic transmission see).
|