Toyota 4 Runner/Hilux/Surf

1987-1998 of release

Repair and car operation



Тойота 4Раннер
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 4. Systems of heating, ventilation
+ 5. Fuel and exhaust systems
+ 6. Transmissions
+ 7. Transmission elements
+ 8. Brake system
+ 9. A suspension bracket and a steering
+ 10. A body
- 11. An electric equipment
   11.1. Specifications
   11.2. The battery
   + 11.3. Ignition system
   11.4. The coil () ignitions
   11.5. The ignition distributor
   11.6. Check and installation of the moment of ignition
   11.7. The block of electronic ignition
   11.8. The induction gauge
   + 11.9. System of a charge of the battery
   - 11.10. The generator
      11.10.1. Generator details
   11.11. System of start-up of the engine
   + 11.12. The starter electric motor
   11.13. The traction relay
   11.14. Pressure check
   11.15. Short circuit detection
   11.16. Check of reliability of grounding
   11.17. Check of integrity of a chain
   11.18. A finding of not closed chain
   11.19. Search of malfunctions
   11.20. Safety locks
   11.21. Fusible crosspieces
   11.22. Breakers
   11.23. The relay
   11.24. The breaker of indexes of turn / of the alarm system
   11.25. The switch of indexes of turn
   11.26. The lock of ignition and a lock drum
   11.27. The switch of external illumination
   11.28. The screen wiper switch
   11.29. Lamps of headlights
   11.30. Adjustment of headlights
   11.31. The headlight case
   11.32. Replacement of lamps
   11.33. The receiver and dynamics
   11.34. The aerial
   + 11.35. The screen wiper electric motor
   11.36. The switch of heating of back glass
   11.37. A heater of back glass
   11.38. A guard of devices
   11.39. A sound signal
   11.40. The electric drive of mirrors
   11.41. Cruise-control
   + 11.42. The electric drive window lifterа
   11.43. The electric drive of door-locks
   11.44. Safety pillows
+ 12. Electroschemes

11.10.1. Generator details
THE GENERAL DATA

Generator details (typical variant)

1, 16. A bearing cover
2, 15. The bearing
3. A rotor
4. A back cover
5. Щеткодержатель
6. The izoljatsionnaja plug
7. The case of the back bearing
8. A contact plate of the rectifier
9. A pressure regulator
10. A brush
11. A spring
12. The buffer
13. A pulley
14. A forward cover

Check and replacement

PERFORMANCE ORDER
1. Remove the generator.
2. Turn away a nut of a back cover.
3. Turn away a nut of a conclusion of the generator.
4. Remove изоляционную the plug of a conclusion and a back cover.
5. Turn away screws of a regulator of pressure and щеткодержателя (are specified by arrows).
6. Remove щеткодержатель.
7. Remove a pressure regulator.
8. The further dismantling is necessary only for replacement of brushes.
9. Measure length of an acting part of brushes.
10. If length of a brush less maximum permissible щеткодержатель in gathering with brushes replace. On some cars replacement only brushes by them перепаивания is provided.
11. Be convinced that brushes freely move in щеткодержателе.
12. Remove the rectifier (arrows specify fastening screws).
13. Remove 4 buffers and грязеотражатель.
14. Designate position of forward and back covers.
15. Turn away a nut and remove a pulley.
16. Turn away 4 nuts and disconnect the case of the back bearing.
17. Remove a persistent washer and get a rotor.

Check and assemblage

PERFORMANCE ORDER
1. Check up resistance between contact rings which should be 2–4 Ohm.
2. Check up a chain between shaft of a rotor and contact rings. The ohmmeter should show infinite resistance.
3. The rotor is faulty if results of both checks unsatisfactory, or in case of the strengthened deterioration of rings.
4. Check up resistance between winding conclusions статора.
5. If resistance is great, or the ohmmeter shows breakage статор it is faulty.
6. Check up short circuit of windings статора on the case (core).
7. Positive probe an ohmmeter put to a conclusion, and negative – to weight. The device should show the closed chain (1 – a positive probe, 2 – a negative probe).
8. At change of polarity of connection of an ohmmeter should наблючаться rupture (1 – a positive probe, 2 – a negative probe).
9. Check up diodes of a positive branch of the rectifier (1 – a positive conclusion, 2 – conclusions of diodes).
10. Check up diodes of a negative branch of the rectifier (1 – a negative conclusion, 2 – conclusions of diodes).
11. Assemblage is carried out upside-down.
12. At installation щеткодержателя wring out brushes.


On the main page