Opel Kadett E

1984-1991 of release

Repair and car operation



Opel Kadett E
+ 1. The maintenance instruction
+ 2. Weekly checks and service in a way
+ 3. Maintenance service
- 4. The engine
   + 4.1. Engine OHV (with a camshaft in the block of cylinders)
   + 4.2. Engines OHC
   - 4.3. Engine DOHC with 16 valves
      4.3.1. A technical characteristics
      4.3.2. Compression check
      + 4.3.3. The operations demanding removal of the engine
      4.3.4. Removal of auxiliary components of the engine
      4.3.5. Removal and installation of the valve of adjustment of pressure of oil
      + 4.3.6. A gear belt
      4.3.7. Removal and installation of the mechanism of a tension of a gear belt and rollers
      4.3.8. Removal, check and installation of camshafts
      + 4.3.9. A head of the block of cylinders
      4.3.10. Removal and installation of the oil pallet and маслоотражательной plates
      + 4.3.11. The oil pump
      4.3.12. Removal and installation of the valve of the thermostat of an oil radiator
      + 4.3.13. Pistons and rods
      4.3.14. Removal and flywheel installation
      + 4.3.15. Replacement of sealing rings
      4.3.16. Removal, check and installation of bearings of a cranked shaft
      4.3.17. Check of components of the engine
      4.3.18. Removal and engine installation
      4.3.19. Start of the engine after major repairs
   + 4.4. Diesel engines 16D and 16DА
   + 4.5. Diesel engines of 1,7 l
+ 5. System of cooling, heating and ventilation
+ 6. Fuel and exhaust systems
+ 7. Start and gymnastics system
+ 8. Ignition system
+ 9. Coupling
+ 10. Transmissions and power shafts
+ 11. Brake system
+ 12. A suspension bracket and a steering
+ 13. A body
+ 14. Electric schemes

4.3.19. Start of the engine after major repairs
PERFORMANCE ORDER
1. Look the corresponding description in subsection 4.1.19, but thus ignore the information on check of turns of idling and adjustment of backlashes of valves.
2. If new camshafts were established, make them обкатку on the modes resulted in subsection 4.2.8.
3. Start the engine and warm up it before inclusion of the fan of a radiator.
4. Switch off the engine, uncover heads of the block of cylinders and tighten a final stage bolts of fastening of a head of the block of cylinders.


On the main page