Subaru Legacy/Outback

1999-2003 of release

Repair and car operation



Subaru Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ The operation manual
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Manual box and differential
+ Automatic transmission
- Coupling
   Specifications
   + Flywheel and coupling
   - Приводные and карданный shaft, back differential
      Drive of forward wheels - the general information
      Removal and installation of rotary fists, service ступичных assemblages of forward wheels
      Removal, service and installation of a forward power shaft
      Drive of back wheels - the general information
      Removal and installation ступичных assemblages of back wheels, replacement back ступичного the bearing
      Removal, check of a condition and installation of components карданного a shaft
      Check of a condition and replacement of a forward epiploon of back differential
      Removal, service, installation and adjustment of back differential of T-type
      Removal, service, installation and adjustment of back differential of VA-type
      Removal, installation and check of a condition of a forward beam of fastening of back differential
      Removal, service and installation of a back power shaft
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Removal, service and installation of a back power shaft

Details of installation of a back power shaft

1 — the Reflective plate (an internal SHRUS)
2 — the External holder of an internal SHRUS
3 — the Spring lock ring
4 — the Internal holder
5 — the Ball
6 — the Separator
7 — the Spring lock ring
8 — the Bandage tape of fastening of a protective cover
9 — the Protective cover of an internal SHRUS
10 — the Protective cover of an external SHRUS
11 — Assemblage of an external SHRUS
12 — the Rotor of wheel gauge ABS

13 — Stupichnyj the bearing
14 — the Wheel bolt
15 — the Nave
16 — Stupichnaja a nut

Efforts of a tightening of carving connections, Nanometer

Т1: 66
Т2: 186

Removal and installation

 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.
2. Release wheel nuts.
3. Поддомкратьте the car also establish it on props. Remove back wheels.
4. Расчеканьте ступичную a nut, also give its face key at the squeezed out pedal of a foot brake.

 In order to avoid damage of bearings after wheel removal ступичную the nut should be weakened and again to tighten!

5. Remove assemblage of back differential (see Has undressed Removal, service, installation and adjustment of back differential of T-type or Removal, service, installation and adjustment of back differential of VA-type).

6. Liberate a back power shaft from a wheel nave, - in case of need take advantage of stripper ST1 926470000 and оправкой ST2 927140000, - try not to damage sealing sponges of an epiploon and a rotor of the wheel gauge.

7. With the help оправки ST1 922431000 and nozzles ST2 927390000 fill an external SHRUS of a power shaft in шлицевое nave connection, - try not to damage a rotor of wheel gauge ABS.

 At installation do not knock on a power shaft a hammer!

8. The further installation is made in an order, the return to an order of dismantle of components. Track that all fixture has been tightened with demanded effort.

Dismantling

 PERFORMANCE ORDER

1. Release bandage tapes, remove a protective cover from a holder of an internal SHRUS and shift it to the shaft middle.
2. Having hooked a screw-driver, remove a spring lock ring of fastening of an external holder of an internal SHRUS.
3. Remove an external holder of an internal SHRUS from power shaft assemblage.
4. Remove greasing and take 6 balls.
5. For removal of a separator from an internal holder develop its half-turn to a path of an internal holder.
6. By means of flat-nose pliers remove a spring lock ring of fastening of an internal holder on a shaft.
7. Remove an internal holder of an internal SHRUS.
8. Remove from a shaft a separator and a protective cover of an internal SHRUS, preliminary having wound with an adhesive tape шлицы pins.
9. Release bandage tapes and remove a protective cover of an external SHRUS, - the external hinge is not subject to dismantling and in case of failure is replaced complete with shaft.

Assemblage

 PERFORMANCE ORDER

 For greasing of components of the external end of a power shaft it is necessary to use greasing Molylex No. 2 (No. 723223010), and for greasing of the internal end - greasing VU-3A702 (No. 23223GA050) (yellow colour).

1. Establish a protective cover of an external SHRUS and fill in it 60 ÷ 70 г greasings Molylex No. 2.
2. Put on a shaft a protective cover of an internal SHRUS, having shifted more close to the assemblage middle.

3. Plant on a shaft a separator of an internal SHRUS.

A — the Separator
B — Sample

4. Establish on a shaft an internal holder of an internal SHRUS and fix its lock ring.
6. Fill in an external holder of an internal SHRUS 80 ÷ 90 г greasings VU-3A702.
7. Fill to relish in separator windows.
8. Fill in подшипниковую assemblage six balls.
9. Level an external holder concerning balls and plant it on bearing assemblage.
10. Plant a spring lock ring in a reception flute on an external holder of an internal SHRUS.
11. Grease with an equal layer of greasing an internal surface of a protective cover (20 ÷ 30).
12. Establish a protective cover of an internal SHRUS, - track, that the cover has not appeared is overwound.

 Inside большего the end of a protective cover of an external SHRUS and a landing flute on the hinge case should be free from greasing and other substances! At installation the hinge should be in neutral position.

13. Fix protective covers new bandage tapes.

CHECK

 PERFORMANCE ORDER

See Has undressed Removal, service and installation of a forward power shaft.


On the main page