Subaru Legacy/Outback

1999-2003 of release

Repair and car operation



Subaru Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ The operation manual
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
- The power supply system and release
   Specifications
   - System of injection of fuel
      Sbrasyvanie pressure in the power supply system
      Опорожнение a fuel tank
      Check of a condition and replacement of fuel lines and them штуцерных connections
      Service of components of an inlet air path
      Removal and installation of the case of a throttle
      Service of components of a drive throttle заслонки
      Removal, service and installation of the inlet pipeline
      Service of the fuel pump
      Removal and installation of main relay MFI
      Removal and installation of the relay of the fuel pump
      Removal and installation of the gauge of a stock of fuel
      Removal and installation of the gauge of level of fuel in the additional chamber of a fuel tank
      Removal, check and installation of the fuel filter
      Removal and installation запорного the valve отсечки fuel
      Removal and installation демпфирующих fuel valves
      Removal and installation of a fuel tank
      Removal and installation of a jellied mouth of a fuel tank
      Removal and installation of components of system of injection of fuel
   + Control systems of the engine and decrease in toxicity of the fulfilled gases
   + System of release of the fulfilled gases
+ Engine electric equipment
+ Manual box and differential
+ Automatic transmission
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Removal, service and installation of the inlet pipeline

Details of installation of the inlet pipeline on models 2.0 and 2.5 l equipped OBD II

1 — the Sealing lining of the right section of the inlet pipeline
2 — Fuel highways
3 — Fuel injectors
4 — the Sealing ring
5 — the Sealing ring
6 — the Sealing ring
7 — Zaglushka
8 — the ventilation Valve картера (PCV)
9 — the Electromagnetic valve of a purge of a coal adsorber
10 — the Nipple
11 — Assemblage of the inlet pipeline
12 — the Sealing lining of the left section of the inlet pipeline
13 — the Protector of the left fuel highway
14 — the Gauge of temperature and pressure of soaked up air
15 — the Sealing ring
16 — the Left basic arm of candle electroconducting
17 — the Protector of the right fuel highway
18 — Fuel lines
19 — Fuel hoses
20 — Collars
21 — Clamps

22 — Electromagnetic valve IAC
23 — the Basic arm of valve IAC
24 — the Directing pin
25 — the Basic arm of the gauge of atmospheric pressure
26 — the Gauge of atmospheric pressure
27 — the Right basic arm of candle electroconducting

Efforts of a tightening of carving connections, Nanometer

Т1: 1.5
Т2: 3.4
Т3: 5.0
Т4: 6.4


Details of installation of the inlet pipeline on models 2.0 and 2.5 l equipped OBD Subaru

1 — the Sealing lining of the right section of the inlet pipeline
2 — Fuel highways
3 — Fuel injectors
4 — the Sealing ring
5 — the Sealing ring
6 — Zaglushka
7 — the ventilation Valve картера (PCV)
8 — the Electromagnetic valve of a purge of a coal adsorber
9 — the Nipple
10 — Assemblage of the inlet pipeline
11 — the Sealing lining of the left section of the inlet pipeline
12 — the Protector of the left fuel highway
13 — the Gauge of temperature and pressure of soaked up air
14 — the Sealing ring
15 — the Left basic arm of candle electroconducting
16 — the Protector of the right fuel highway
17 — Fuel lines

18 — Fuel hoses
19 — Collars
20 — Clamps
21 — the Directing pin
22 — the Right basic arm of candle electroconducting

Efforts of a tightening of carving connections, Nanometer

Т1: 1.5
Т2: 3.4
Т3: 5.0
Т4: 17
Т5: 19
Т6: 25


Details of installation of the inlet pipeline on l models 3.0 (OBD II)

1 — Dempfernyj the valve of a fuel path
2 — the Collar
3 — Fuel tenches
4 — Perepusknoj an air hose
5 — Perepusknaja an air tube and a line of a purge of a coal adsorber
6 — Sealing linings
7 — the Electromagnetic valve of a purge of a coal adsorber
8 — the Protector of the left fuel highway
9 — the Basic arm of a cable of gas
10 — the Nipple
11 — Zaglushka
12 — Assemblage of the inlet pipeline
13 — the Operating electromagnet of the induction valve
14 — Valve EGR
15 — Sealing linings
16 — Tube EGR

17 — the Protector of the left fuel highway
18 — the Induction valve
19 — the Sealing lining

Efforts of a tightening of carving connections, Nanometer

Т1: 6.4
Т2: 5.0
Т3: 17
Т4: 19
Т5: 25

REMOVAL

All models

 PERFORMANCE ORDER

1. Dump pressure in the power supply system (Razdel Sbrasyvanie of pressure in the power supply system see).
2. Open лючок access and uncover a jellied mouth of a fuel tank.
3. Disconnect a negative wire from the battery.


Models 2.0 and 2.5 l

 PERFORMANCE ORDER

1. Remove inlet section of an air path with an air cleaner (see Has undressed Service of components of an inlet air path).
2. Disconnect cables of a drive throttle заслонки.
3. Remove assemblage of the steering pump (electroconducting disconnect) and, without disconnecting from it hydraulic lines, postpone for a mudguard of the right wing, preliminary having spread rags.
4. Disconnect electroconducting from spark plugs.

5. Disconnect from the inlet pipeline hose PCV.


6. Disconnect from the case of a throttle hoses охладительного a path.

7. Disconnect a hose of the vacuum amplifier of brakes.

8. Remove right assembly скобу an air cleaner and a basic arm of a plait of electroconducting of the engine. Disunite sockets of connection of electroconducting of the engine to laid on a partition of a motor compartment to a plait.

9. Disconnect electroconducting from gauges of temperature of a cooling liquid (ECT), detonations (KS), positions cranked (CKP) and distributive (CMP) shaft and the gauge-switch of pressure of oil.


10. Disconnect from tubes hoses of fuel lines, - in avoidance разбрызгивания fuel turn released штуцерные sockets rags.
11. Turn out fixing bolts and take assemblage of the inlet pipeline from an impellent compartment.

L models 3.0

 PERFORMANCE ORDER

1. Remove inlet section of an air path with an air cleaner and воздухоприемной the chamber (see Has undressed Service of components of an inlet air path).
2. Disconnect cables of a drive throttle заслонки.
3. Remove assemblage of the steering pump (electroconducting disconnect) and, without disconnecting from it hydraulic lines, postpone for a mudguard of the right wing, preliminary having spread rags.

4. Turn out bolts of fastening of the tank of a liquid of washing of glasses.

5. Disconnect electroconducting from electromotors of pumps of giving of a liquid on the forward and back has flown down.

6. Disconnect a hose from the pump of giving of a liquid on back glass, - the open end of the union at once закупорьте.

7. Remove the tank and tie up it to the left loop of a cowl.

8. Disconnect from a cover of a head of cylinders hoses PCV.

9. Disconnect hoses охладительного a path from the throttle case.

10. Disconnect a hose of the vacuum amplifier of brakes.

11. Lift the receiver also valve EGR, - try not to drop sealing linings.

12. Disunite sockets of connection of electroconducting of the engine to laid on a partition of a motor compartment to a plait.

13. Disconnect from the inlet pipeline the tyre of grounding of the power unit.

14. Disconnect from tubes hoses of fuel lines, - in avoidance разбрызгивания fuel turn released штуцерные sockets rags.
15. Disconnect the tyre of grounding from a protector of the left fuel highway, then remove a protector.

16. Disconnect a hose of giving of additional air (), then turn out bolts () fastenings of the left fuel highway to a head of cylinders.


17. Disconnect the tyre of grounding and remove a protector of the right fuel highway.

18. Disconnect a hose of giving of additional air (), then turn out bolts () fastenings of the right fuel highway to a head of cylinders.

19. Turn out fixing bolts to heads of cylinders and remove assemblage of the inlet pipeline.

DISMANTLING

Models 2.0 and 2.5 l

 PERFORMANCE ORDER

1. Disconnect from the inlet pipeline the grounding tyre.

2. Disconnect electroconducting from assemblage of the module of ignition.

3. Turn out fixing bolts and remove assemblage of the module of ignition.

4. Disconnect electroconducting from the gauge of temperature/pressure of soaked up air (IAT).

5. Turn out fixing bolts and remove gauge IAT assemblage.

6. Cнимите assemblage of the case of a throttle.

7. Disconnect electroconducting from the valve подмешивания air to injectors. Turn out fixing bolts and remove assemblage of the valve from the inlet pipeline.

8. Disconnect from the pipeline a vacuum hose of a regulator of pressure.

9. If have not done it at a dismantle stage, remove protectors of fuel highways.

10. Disconnect electroconducting from fuel injectors and the electromagnetic valve of a purge of a coal adsorber.

11. Disconnect перепускной a hose from the electromagnetic valve of a purge of an adsorber.

12. Remove collars () and basic arms () fastenings on the inlet pipeline of a plait of electroconducting of the engine. Remove burn down electroconductings.

13. Turn out a fixing bolt and remove the electromagnetic valve of a purge of a coal adsorber.

14. Turn out fastening bolts to the inlet pipeline of fuel tubes.

15. Take clamps and remove fuel injectors.

16. Disconnect from the inlet pipeline перепускные air hoses.

17. Release fixing collars of fuel hoses and remove assemblages of fuel highways.

18. Turn out a fixing bolt and remove from the inlet pipeline assemblage of fuel lines and a regulator of pressure of fuel.


L models 3.0

 PERFORMANCE ORDER

1. Cнимите assemblage of the case of a throttle.

2. Having turned out fixing bolts, remove the induction valve.

3. Disconnect electroconducting from an operating electromagnet of the induction valve, turn out a fixing bolt and remove electromagnetic assemblage.

4. Having disconnected electroconducting, remove the electromagnetic valve of management of a purge of a coal adsorber and valve EGR.

5. Having released fixture, remove from the inlet pipeline burn down engine electroconductings.

6. Remove from the inlet pipeline tube PCV.

7. Remove assemblage of tubes подмешивания air to injectors and purges of a coal adsorber.

8. Disconnect from the inlet pipeline a vacuum hose () a pressure regulator, then turn out fixing bolts and remove assemblage of a fuel highway.

9. Disconnect from the inlet pipeline a vacuum hose.

ASSEMBLAGE

Models 2.0 and 2.5 l

 PERFORMANCE ORDER

1. Assemblage is made in an order, the return to an order of dismantle of components. Do not forget to replace sealing rings of fuel injectors and the gauge of temperature/pressure of soaked up air. Track correctness of connection испарительных hoses to the electromagnetic valve of management of a purge of a coal adsorber.

And — Sealing rings
In — the Injector

2. Track, that all fixture has been tightened with demanded effort (Specifications and signatures to illustrations in subsection "Dismantling" see).


L models 3.0

 PERFORMANCE ORDER

1. Assemblage is made in an order, the return to an order of dismantle of components. Track correctness of connection испарительных hoses to the electromagnetic valve of management of a purge of a coal adsorber and vacuum hoses of the induction valve.
And — To a purge line
In — To a fuel line

2. Track, that all fixture has been tightened with demanded effort (Specifications and signatures to illustrations in subsection "Dismantling" see).

INSTALLATION

 PERFORMANCE ORDER

Installation is made in an order, the return to an order of dismantle of components. Track, that all fixture has been tightened with demanded effort (Specifications and signatures to accompanying illustrations in subsection "Removal" see). Do not forget to establish to the place of the relay of the fuel pump (Razdel Sbrasyvanie of pressure in the power supply system see).


On the main page