Subaru Legacy/Outback

1999-2003 of release

Repair and car operation



Subaru Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ The operation manual
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
- Engine electric equipment
   Specifications
   Start of the engine from the auxiliary power supply
   Removal/installation, check and service of the storage battery
   Check of a condition and replacement of wires of the battery
   Ignition system - the general information and safety measures
   Check of serviceability of functioning of system of ignition
   Removal, installation and check of a condition of the module (it) of ignition
   Check and adjustment of installation of a corner of an advancing of ignition
   Replacement of gauges CKP, CMP and KS
   Service and replacement of spark plugs
   Check of a condition of high-voltage wires (4-cylinder engines)
   Charge system - the general information and safety measures
   Check of a condition of system of a charge
   The generator - the general information, check and service
   Removal, dismantling, assemblage and generator installation
   Start system - the general information and safety measures
   Check of serviceability of functioning of a starter and start chain
   Starter Nippondenso - check and service
   Starters Mitsubishi - check and service
+ Manual box and differential
+ Automatic transmission
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Check of a condition of system of a charge

 PERFORMANCE ORDER

1. Remember that infringements of functioning of system of a charge far are not necessarily connected with generator refusals. First of all always make following elementary checks:

a) Check up a condition and effort of a tension drive a generator belt (Routine maintenance see the Head). In case of need make replacement;
b) Check up reliability of a tightening of fixing bolts of the generator;
c) Check up a condition of electroconducting and electric connections of the generator;
d) At a corresponding complete set check up a condition of the fusible insert established between the traction relay of a starter and the generator, or a condition of the big main safety locks in an impellent compartment. In case of revealing of the beaten out elements, reveal and eliminate the reason of taking place overloads, then replace defective components;
e) Check up a condition of all safety locks included in an electric chain of system of a charge. The site of safety locks and fusible inserts can vary depending on model and year of release of the car;
f) Start the engine and estimate intensity of a noise background published by the generator;
g) Check up electrolit density in banks of the storage battery, in case of need make additional charge of last;
h) Make sure of completeness of a charge of the battery, - one faulty bank can be at the bottom of a battery recharge;
i) Disconnect from the battery both wires (at first negative). Estimate a condition of wires of the battery in places of their connection to polar plugs of last. Check up reliability of fastening клеммных clips. Carefully having smoothed out contact plugs, connect the battery.
2. By means of the voltmeter measure the pressure which is given out by the battery at the muffled engine, - the result of measurement should make approximately 12 Century
3. Start the engine and repeat check: this time indications should make 14.1 ÷ 14.8 Century
4. Include head headlights, - at regularly functioning system of a charge pressure should fall at first, then be restored to former level.
5. If the size of measured pressure considerably exceeds rating value, replace a pressure regulator.
6. At excessively low indications make checks of a regulator of pressure and the generator (see more low).


On the main page