10. Turn out fixing bolts, uncover and take components редукционного the valve.
CHECK
PERFORMANCE ORDER
1. Check up the case редукционного the valve on presence of signs of infringement of passableness маслотоков, cracks, cavities and other damages. 2. Make sure of absence of extraneous particles on прокладочном the filter.
INSTALLATION
PERFORMANCE ORDER
1. Establish редукционный the valve with a lining and, operating strictly in a certain order, tighten bolts of its fastening with demanded effort (6.4 Nanometers).
The sizes of bolts (1) and (5: 6) x 26 (2), (3), (4) and (9: 6) x 35 (6), (7), (8) and (10: 6) x 16
2. The further installation is made in an order, the return to an order of dismantle of components.