Subaru Legacy/Outback

1999-2003 of release

Repair and car operation



Subaru Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ The operation manual
+ Routine maintenance
- The engine
   Specifications
   Check компрессионного pressure in cylinders and tightness of the block
   Diagnostics of a condition of the engine with vacuum gauge application
   System of greasing of the engine - the general information
   + The procedures of the repair which has been not connected with extraction of the engine from the car, - four-cylinder engines
   - The procedures of the repair which has been not connected with extraction of the engine from the car, - six-cylinder engines
      Reduction of the piston of the first cylinder in position ВМТ
      Check and adjustment клапанных backlashes
      Removal and installation of a pulley of a cranked shaft
      Removal and installation of covers of drive ГРМ
      Removal and installation газораспределительных chains
      Removal and installation of asterisks of a drive of camshafts
      Removal and installation of an asterisk of a cranked shaft
      Automatic натяжитель газораспределительной chains - the general information
      Removal and installation of camshafts
      Removal and installation of heads of cylinders
      Removal and installation of the bottom section of the pallet картера and маслозаборника
      Removal, service and installation of the oil pump
      Service редукционного the valve of the oil pump
      Check of pressure of impellent oil
      Removal and installation of the gauge-switch of pressure of oil
      Removal and installation маслоохладителя
      Removal and installation drive a disk
      Replacement of support of a suspension bracket of the power unit
   + The general and major repairs of engines
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Manual box and differential
+ Automatic transmission
+ Coupling
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Removal and installation of heads of cylinders

REMOVAL

 PERFORMANCE ORDER

1. Remove a pulley of a cranked shaft (see Has undressed Removal and installation of a pulley of a cranked shaft).
2. Remove a forward cover of drive ГРМ (see Has undressed Removal and installation of covers of drive ГРМ).
3. Remove газораспределительную a chain (see Has undressed Removal and installation газораспределительных chains).
4. Remove asterisks of camshafts (see Has undressed Removal and installation of asterisks of a drive of camshafts).
5. Remove an asterisk of a cranked shaft (see Has undressed Removal and installation of an asterisk of a cranked shaft).
6. Remove a back cover of drive ГРМ (see Has undressed Removal and installation of covers of drive ГРМ).
7. Remove camshafts (see Has undressed Removal and installation of camshafts).

8. Operating strictly in a certain order), in regular intervals ослабьте also turn out bolts of fastening of a head of cylinders.

 Bolts (2) and (4) leave wrapped on three-four coils for the purpose of head fixing at last stage.

9. Обстучав on perimetre a hammer with soft brisk, separate a head from the block of cylinders.
10. Turn out the left two fixing bolts (2) and (4) and remove a head from the engine.
11. Remove a sealing lining, - try not to damage interfaced surfaces of a head and the block.
12. Operating in a similar manner, remove the right head of cylinders (a fixture reversing make in a mirror order).

Preparation for installation

 PERFORMANCE ORDER

1. Carefully smooth out and dry wipe interfaced surfaces of a head and the block of cylinders. For removal of all traces of a material of an old lining and a deposit use a firm plastic or wooden scraper. Smooth out also the bottoms of pistons. Be extremely cautious, - the surfaces made of soft metal can be damaged easily. Remember that the dirt should not get in маслотоки, water galleries and carving apertures, - закупорьте all open channels suitable stoppers, or close up with an adhesive tape. For the purpose of prevention of hit of a deposit in backlashes between pistons and cylinders, fill the last dense greasing which on termination of clearing procedure will be easy for removing a rigid brush. On termination of cleaning wipe all surfaces pure dry rags.
2. Survey interfaced surfaces of a head and the block on presence of deep scratches, cracks, cavities and other damages. Insignificant defects can be eliminated by means of a file with a small tooth, in more serious cases it is necessary to give a head in проточку, or to replace.
3. Make sure of cleanliness and dryness of carving apertures, - just in case blow their compressed air (it is possible to take advantage of the bicycle pump). Presence at deaf apertures of traces of greasing can lead to block destruction at a tightening of bolts as a result of increase of hydraulic pressure.
4. By means of a steel ruler and probeа лезвийного type check up planeness of an interfaced surface of a head (see Has undressed Service of a head of cylinders of the present Chapter).

INSTALLATION

 PERFORMANCE ORDER

1. Having replaced a sealing lining, establish a head of cylinders on the regular place on the block.
2. Grease carving parts of fixing bolts, persistent surfaces of their heads and a washer with impellent oil.

3. Establish a head on the block of cylinders. Screw bolts and tighten them in strictly certain order, with effort of 20 Nanometers. Operating in a former order, tighten fixture with effort of the second stage (50 Nanometers).

4. In two steps release all bolts, turning everyone on 180 °, - operate in an order, the return to an order of a tightening of fixture.
5. Tighten bolts in a former (normal) order with effort of 25 Nanometers, then hold on on 90 degrees.
6. At the final stage it is necessary to hold on bolts with (1) on (4) for 90, and with (5) on (8) - on 45 degrees.
7. The further installation is made in an order, the return to an order of dismantle of components.


On the main page