Subaru Legacy/Outback

1999-2003 of release

Repair and car operation



Subaru Legasi, Autbek
+ Cars Subaru Legacy, Outback
+ The operation manual
+ Routine maintenance
+ The engine
+ Systems of cooling, heating
+ The power supply system and release
+ Engine electric equipment
+ Manual box and differential
+ Automatic transmission
+ Coupling
- Brake system
   Specifications
   Brake mechanisms of forward and back wheels - the general information
   Lay brake - a design and a functioning principle
   The pressure valve-terminator - a design and a functioning principle
   Protivootkatnaja system - the device, a functioning and safety measure principle
   System of antiblocking of brakes (ABS) - the general information, a functioning principle
   System of dynamic stabilisation (VDC) - the general information, a functioning principle
   Check of a condition replacement колодок disk brake mechanisms of forward wheels
   Removal, check of a condition and installation of forward brake disks
   Removal, service and installation of disk brake mechanisms of forward wheels
   Check of a condition and replacement колодок disk brake mechanisms of back wheels
   Removal, check of a condition and installation of back brake disks
   Removal, service and installation of disk brake mechanisms of back wheels
   Removal, service and installation of the main brake cylinder (ГТЦ)
   Removal, installation and check of serviceability of functioning of the vacuum amplifier of brakes
   Removal, installation and check of serviceability of functioning of the valve-terminator of pressure
   Replacement of a brake liquid
   Prorolling of a hydraulic path of brake system
   Check of a condition and replacement of flexible brake hoses
   Check of a condition and replacement of tubes of a brake path
   Removal, service, installation and adjustment of a pedal of a foot brake
   Removal, condition check, installation and adjustment of the gauge-switch of stoplights
   Removal, installation, check of a condition and adjustment of the lever of a drive of a lay brake
   Removal, check of a condition and installation of elements тросового a drive of a lay brake
   Removal, installation and adjustment of the mechanism of a lay brake
   Removal, installation, check of a condition and adjustment of components противооткатного devices
   Removal, installation and check of serviceability of functioning of assemblage of the module of management/hydromodulator ABS
   Check of sequence of operation of valves of hydromodulator ABS
   Removal, installation and check of serviceability of functioning of forward wheel gauges ABS
   Removal, installation and check of serviceability of functioning of back wheel gauges ABS
   Removal, installation and check of a condition of rotors of wheel gauges
   Removal, installation and diagnostics of the gauge of overloads (G-gauge)
   Problem diagnostics ABS
   Removal, installation and adjustment of the module of management VDC
   Removal, installation and check of serviceability of functioning of hydromodulator VDC
   Check of sequence of operation of valves of hydromodulators ABS and VDC
   Removal, installation and check of serviceability of functioning of the gauge of withdrawal / cross-section overloads
   Removal, installation and check of serviceability of functioning of the gauge of an angle of rotation of steering wheel VDC
   Removal, installation and check of serviceability of functioning of wheel gauges from rotors
   Removal, installation and check of serviceability of functioning of the switch of deactivation VDC (VDC OFF)
   Problem diagnostics VDC
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Removal, service and installation of the main brake cylinder (ГТЦ)

Details of installation ГТЦ (models without VDC)

1 — a tank Cover
2 — the Mesh filter
3 — the Tank
4 — the Holder of pistons
5 — the Primary piston
6 — the Secondary piston
7 — the cylinder Case
8 — the Finger (models with ABS)

9 — Landing sealing plugs
10 — the Pin

Efforts of a tightening of carving connections, Nanometer

Т: 14


Details of installation ГТЦ (models with VDC)

1 — a tank Cover
2 — the Mesh filter
3 — the Tank
4 — the Lock ring
5 — the Primary piston
6 — the Secondary piston
7 — the cylinder Case
8 — the Finger

9 — Landing sealing plugs
10 — the Pin

Efforts of a tightening of carving connections, Nanometer

Т: 14

REMOVAL

 PERFORMANCE ORDER

1. Completely pump out a brake liquid from tank GTTS.
2. Disconnect electroconducting from the gauge-switch of level of a brake liquid. Disconnect from ГТЦ hydraulic tubes, - at once закупорьте the open ends of lines in order to avoid hit in dirt system.
3. Release nuts of fastening ГТЦ and separate last from assemblage of the vacuum amplifier of brakes, - try not to admit hit of a brake liquid on painted кузовные a surface. Traces of the spilt liquid immediately collect paper towels.

DISMANTLING

 PERFORMANCE ORDER

1. Carefully wipe surface ГТЦ.
2. Prepare necessary tools and accurately spread out them on a pure workbench.
3. With the help выколотки take a fastening pin on ГТЦ the tank of a brake liquid.

4. Wring out in the cylinder the primary piston and by means of a suitable magnet take fixing finger.

5. On not equipped with system of dynamic stabilisation (VDC) models hook a lock uvula and remove the holder of pistons.

6. On models with VDC by means of suitable nippers remove a lock ring.

7. Be cautious, - the primary piston can jump out of the cylinder.
8. Take from the cylinder both pistons.

Piston group GTTS requires dismantling only in case of need replacements of the complete set of springs.

9. Wash out the removed components and internal walls of the cylinder a pure brake liquid or methyl spirit.

 At using метанолом do not immerse in it rubber cups of pistons more than for 30 seconds in order to avoid their swelling!

10. Attentively study a condition of components ГТЦ (piston assemblages, an emphasis of the submitting valve, a lining and so forth). Defective units replace.

 Pistons are replaced in the complete set (primary with secondary). Pistons are subject to replacement also in case the backlash of landing any of them in the cylinder exceeds 0.11 mm. Try not to admit hit in assemblage of extraneous particles.

ASSEMBLAGE

 PERFORMANCE ORDER

1. Make sure of absoluteness of cleanliness of all components.
2. Grease with a pure brake liquid pistons and internal walls of the cylinder and establish into place piston group GTTS.
3. Wring out the primary piston and establish into place fixing finger.
4. On models without VDC wring out a lock uvula and plant into place the holder of pistons. On models with VDC establish a lock ring, having tracked reliability of its landing in a reception flute.

5. Establish on the tank landing sealing plugs.

6. Plant the tank on assemblage ГТЦ and fix its pin.

INSTALLATION

 PERFORMANCE ORDER

1. Installation is made in an order, the return to an order of dismantle of components. The effort of a tightening of fixing nuts makes 14 Nanometers. Nakidnye nuts штуцерных sockets are tightened with effort of 15 Nanometers.
2. Fill in in the tank a fresh hydraulic liquid and pump over brake system (the Section Prorolling of a hydraulic path of brake system see).


On the main page